The Utility Regulator has published the 2007 Northern Ireland Pressure Report outlining the ability of the gas transmission network to deal with demands in the period up to 2014.
This report has been prepared by BGE(UK) and Premier Transmission Limited as part of their Network code obligations.
Alternatively a paper copy can be obtained from Ian Davidson, NIAUR, Queens House, 14 Queen Street, BELFAST, BT1 6ER. E-mail: ian.davidson@niaur.gov.uk.
Copies of the document will be made available in large print, Braille, audio cassette and a variety of relevant minority languages if required.